LEED (EBOM) Case Study – 100 North Tampa

Posted by Bryan Lauer, LEED AP in GoGreen on 21-05-2009

The following LEED (EBOM) Case Study will briefly discuss the LEED pre-requisites and credits 100 North Tampa is attempting to submit to the USGBC.  The LEED case study will be broken down into the 6 LEED categories.  Currently we are at the end of our performance period tying up loose ends before application submission.  The LEED (EBOM) process has been a huge success and saving the building money.

Sustainable Sites (SS)

SS Credit 2:  Bldg. Exterior & Hardscape Management Plan - All exterior products used at 100 North Tampa are considered environmentally friendly.  This benefits the environment and reduces harmful chemicals brought on site.

SS Credit 3:  Integrated Pest Management, Erosion Control & Landscape ManagementNo chemicals are used in pest control and landscaping products.  All products are environmentally friendly benefiting the outdoor environment and reduces harmful chemicals brought on site.

SS Credit 7:  Heat Island Reduction – Non-Roof -100 North Tampa has 14 floors of parking garage space within the buildings site totaling 1.2 spaces per 1,000 square feet.

Water Efficiency (WE)

WE pre-requisite 1:  Minimum Indoor Plumbing Fixture & Fitting Efficiency – 100 North Tampa retrofit toilets, faucets and shower heads with high-efficiency, low-flow products creating an estimated water savings of 1.5Million Gallons per Year saving $12,000/year in water costs!

WE Credit 1.1:  Whole Building Metering – 100 North Tampa has 3 meters which total the entire water usage allowing Management to track water usage patterns. Go Green!

WE Credit 1.2:  Water Performance Measurement – 100 North Tampa has 5 submeters to hone in on how much water each end use is using allowing to develop strategies on ways to reduce the water usage.  1 of our meters tracks the amount of condensate water we capture in our cooling tower that is re-used back into the cooling tower saving an estimate 1.6 Million Gallons/Year!

WE Credits 2.1-2.3:  Indoor Plumbing Fixture & Fitting Efficiency- 10-30% Reduction – 100 North Tampa saves 38% of water compared to the LEED (EBOM) Baseline!  The plumbing fixture & fitting retrofit is how we did this. Go Green.

WE Credits 3.1-3.3:  Water Efficient Landscape – 50-100% Reduction – 100 North Tampa shut down our irrigation system because our landscape consists of native and adaptive plants which are well establish.

WE Credit 4.1:  Cooling Tower Water Management - 100 North Tampa collects condensate water (saving estimate of 1.6 Million Gallons/Year), uses water softener (saving an estimated 1.3 Million Gallons/year) and a TRASAR 3D system to monitor the water’s conductivity for optimal conditions.

Go Green!  Let me help you LEED Certify your building.  Bryan Lauer, LEED AP.  813.349.8550

Other categories to Come…


Help others go green:
  • Digg
  • del.icio.us
  • Facebook
  • Mixx
  • Google
  • De.lirio.us
  • Fark
  • Furl
  • LinkedIn
  • MySpace
  • NewsVine
  • StumbleUpon
  • Technorati
  • TwitThis
  • Upnews
  • Webnews.de
  • Yahoo! Buzz

Comments:

There are (1) Comments for the LEED (EBOM) Case Study – 100 North Tampa

Post a comment

Twitter Users!
Enter your personal information in the form or sign in with your Twitter account by clicking the button below.